WR1.HK
Home / Your WR1 process

WR1.HK / PRACTICAL GUIDE

Your WR1 process

Enter your details once. Our team can bring them into a working draft, with a clear handover at every step.

Updated 25 October 2026
01
Customer

Enter your details

Choose the service and district, then add your name and Hong Kong phone number. Add the installation address and owner details if available. The contact person and owner may differ.

02
Customer

Review and submit

Preview your details, consent to storage, then select Confirm submission. A reference number confirms receipt by the system. Keep that reference.

03
Our team

Contact and assignment

An administrator reviews the enquiry and assigns a worker. The quotation, scope, visit and shutdown arrangements are confirmed separately. WhatsApp is available for follow-up.

04
Responsible worker

Site checks and testing

The assigned worker imports your details into a draft, verifies the installation and owner details, and carries out the appropriate inspection, testing and records. Any defects require follow-up.

05
Responsible worker

Prepare drawings and forms

Verified circuit, protection and conductor details are used to generate the single-line diagram and WR1 draft. Customers do not need to determine technical specifications.

06
Responsible registered persons

Review, sign and hand over

The tool exports a draft PDF. Responsible registered persons must verify the document and complete the necessary signatures, endorsement and handover. A downloaded draft is not an issued certificate.

No reference after submission?

Keep this page and retry, or contact +852 6388 6632 on WhatsApp. You must press Send in WhatsApp yourself. A WhatsApp message alone does not create a staff inbox record.

Download customer process PDF (Chinese) ↓