WR1 completion certificate
Covers the relevant fixed electrical work and its inspection and testing, signed by the responsible REW and endorsed by the REC.
HONG KONG / SUBDIVIDED UNITS
This guide covers residential subdivided units (SDUs), commonly called 劏房 in Hong Kong. Individual-meter applications involve inspection, testing and WR1 documentation for the relevant fixed electrical installation. Basic Housing Unit certification, grace-period registration and letting eligibility require separate checks.
Sources checked: 29 October 2026Covers the relevant fixed electrical work and its inspection and testing, signed by the responsible REW and endorsed by the REC.
CLP or HK Electric processes the meter application and installation requirements. Establish who provides the existing meter first.
The Housing Bureau regime covers living-environment standards beyond electrical work. Verify its status separately from WR1.
Three example units, each paired with its own utility meter and distribution board. Assess shared areas separately.

Official sources: EMSD · SDU individual metersEMSD · Meter installation guide (March 2026)
New fixed installations and relevant alterations, additions or repairs require inspection, testing and completion certification for the actual scope. At enquiry stage, explain whether you need an existing-installation assessment, rewiring or work supporting an individual-meter application.
Official sources: EMSD · Registered contractor guidance
The BHU individual-meter requirement refers to a meter provided by the electricity company. Ask the REC to check separation of each SDU’s supply circuits, meter positions and necessary drawings before following the utility’s dedicated application process. Appearance alone cannot establish whether an existing landlord submeter meets the application needs.
Official sources: EMSD · SDU individual metersEMSD · Meter installation guide (March 2026)
Use this checklist to support assessment. The utility determines the documents for a formal supply application. Do not upload identity documents or tenants’ personal details for an initial website enquiry.
Official sources: CLP · SDU supply applications
Establish the premises and work before agreeing tests, improvements and documents. Online details reduce repeated data entry; they do not replace site inspection.
Official sources: EMSD · Meter installation guide (March 2026)CLP · SDU supply applications
WR1 concerns work completion; WR2 concerns periodic testing of applicable installations. Check the installation category, approved loading and other applicable requirements. The SDU label alone does not determine the certificate, and it does not mean every unit needs a new WR1 each year.
Official sources: EMSD · Registered contractor guidance
At this review date, phase one began on 1 March 2026, with registration for existing SDUs running until 28 February 2027. The unlawful-letting provisions take effect on 1 March 2027. Arrangements differ for existing units, new units and units with valid grace-period registration; confirm the specific case with the Housing Bureau.
Official sources: Housing Bureau · BHU regime
Ask whether site testing, circuit records or drawings, remedial work, retesting and documents are included. Identify coordination for meter positions or shared facilities separately. A fixed price or issue date cannot be promised before assessment. Building alterations, fire safety and other professional matters also need separate consideration.
Official sources: Buildings Department · Subdivided units
WR1 alone cannot establish that. It concerns the relevant electrical installation. BHU certification, valid grace-period registration, building requirements and other applicable conditions require separate checks.
Official sources: Housing Bureau · BHU regimeBuildings Department · Subdivided units
The responsible REC/REW must establish the address, unit identification and tested scope of each installation, then prepare documents meeting the utility application requirements. Do not reuse an old WR1 with an unclear scope.
Official sources: EMSD · Registered contractor guidanceCLP · SDU supply applications
Online tools can organise details or generate an unsigned draft. Formal certification depends on the actual work and inspection and test results, with the responsible registered personnel’s signature and endorsement.
Official sources: EMSD · Registered contractor guidance
Sources checked: 29 October 2026
Official sources: EMSD · SDU individual metersEMSD · Meter installation guide (March 2026)EMSD · Registered contractor guidanceHousing Bureau · BHU regimeCLP · SDU supply applicationsHK Electric · SDU supply applicationsBuildings Department · Subdivided units
Actual form pages, a diagram and attachments explain different stages.